Middleton Cheney Childrens Centre
Keith Barrow Heating & Plumbing Special Projects worked on behalf of SDC Builders for the Middleton Cheney Children's Centre.
6th October 2010
Re: Middleton Cheney Childrens Centre
We thank you for the opportunity to tender for the above works and are pleased to offer our quotation based on receipt of the following documentation:
Enquiry Letter Dated 21/09/10 ref: AL/dls/SP654
BSD Design Specification
Mechanical Services Drawings: - M-1101 Rev C1, 1201 Rev C1, 1401 Rev C1, 1501 Rev C1, 1601 Rev C1
PHP Architects Drawings
Project Particulars and M&E Preambles
Our price for carrying out this work has been evaluated using the documentation detailed above and would be for the sum of the following works detailed in the particular mechanical specification:
1.0 - Preliminaries & site set up £250.00
2.0 - Strip out & enabling
2.1 - Removal of 3No existing electric fan convectors in the library £Inlcuded
3.0 - Hot & cold water services
3.1 - Pipework, valves & fittings £2,870.00
3.2 - Thermal insulation £450.00
3.3 - Mains cold water supply pipework £Included
3.4 - New water heater £457.20
4.0 - Above ground drainage
4.1 - Associated drainage pipework & sanitary ware installation only £756.60
5.0 - LTHW heating
5.1 - Provision & installation of new radiators & boiler (inc. flue) £5,599.94
5.2 - Pipework, valves & fittings (Pressurisation Unit, pump, sets, header etc ..) £7,258.00
5.3 - Thermal insulation £450.00
5.4 - Boiler controls £Inlcuded
6.0 - Mechanical ventilation
6.1 - Extract ventilation fans £750.15
6.2 - Wiring of heat recovery unit £excluded
7.0 - Gas pipework £Included
8.0 - Testing & commissioning £1,100.00
9.0 - Provisional sum for new gas supply (FULCRUM) £3,964.00
10.0 Provisional sum for new incoming water supply £2,000.00
11.0 - Operating & maintenance manuals £250.00
12.0 - As installed drawings £250.00
13.0 - Contingency sum £4,000.00
Sub total : £30,405.89
Main Contractors Discount 1/39th : £779.64
Total = £31,185.53
NB:- Air bricks to the plantroom to be supplied free issue from the main contractor
NB:- All sanitary ware to be provided free issue by the main contractor
NB:- We have only allowed for incoming services from point of entry within the plantroom. No external works have been included
Job Valuation: £31,185.53
Please see attached photos
Posted Date: 29th Mar 2011